13–17 Oct 2014
IHEP
PRC timezone

Contribution List

61 out of 61 displayed
Export to PDF
  1. 14/10/2014, 09:00
  2. 14/10/2014, 13:30
  3. 15/10/2014, 08:30
  4. 15/10/2014, 13:25
  5. 16/10/2014, 08:30
  6. 16/10/2014, 13:25
  7. 17/10/2014, 08:30
  8. 17/10/2014, 10:25
  9. ]"> DrHiroaki Kimura(RIKEN)
    SACLA is the Spring-8 Angstrom Compact free electron LAser, it was operated from 2011. SPring-8 is located on the very good ground, which is very stable and rigid bedrock. In contrast, the area of SACLA building, whose length is 640m, is not rigid enough. The bedrock area (cutting area) is only 1/5 of the building and 4/5 is located on the overlapping area. The maximum thickness of the...
    Go to contribution page
  10. , ]"> MrWeihu Zhou(Academy of Opto-electronics, Chinese Academy of Sciences), MsZili Zhang(Academy of Opto-electronics, Chinese Academy of Sciences)
    Laser trackers are widely used in large-scale measurement such as accelerator alignment, aerocraft assembly and ship building. The mechanical and optical structure errors in laser trackers such as mirror tilt and offset introduce systematic errors which have essential influence on the measurement accuracy. In this paper a method for measuring mirror-tilt error of the laser tracker was...
    Go to contribution page
  11. ]"> MrVasileios Velonas(GSI Helmholtz Center for Heavy Ion Research)
    The preparatory work for the construction of FAIR, the International Facility for Antiprotons and Ion Research, located next to GSI Helmholtz Center in Darmstadt/Germany, is in good progress. Thus the erection of the building shell for the facility can begin as scheduled in 2015. Meanwhile all of the approximately 1400 65m-long drilled concrete piles for stabilization the substructure and for...
    Go to contribution page
  12. ]"> MrMark Emamian(Duke University)
    In the fall of 2012, a major upgrade to the Duke Free Electron Laser (DFEL) Storage Ring was completed. This work was carried out by installing two additional helical undulators using a Wiggler Switchyard System. This mechanism utilizes a quick changeover between two planar OK-4 undulators and two new helical OK-5 undulators in the middle of the FEL straight section in a relatively short...
    Go to contribution page
  13. ]"> MrWEI-YANG Lai(National Synchrotron Radiation Research Center)
    After the construction of Taiwan Photon Source (TPS) was finished, the variation of the survey fiducials was stable. However, the following precise alignment work is influenced by the change of temperature critically. In this paper, we will describe the whole process of alignment work in the TPS storage ring with the relation of the survey network and the temperature of the environment. We...
    Go to contribution page
  14. ]"> DrHELENE MAINAUD DURAND(CERN)
    CLIC (Compact LInear Collider) project will consist of more than 20000 two meters long modules. A test seup made of 3 mocules has been built at CERN to validate the assembly and integration of all components and technical systems in the crowded environment of a module and to validate the short range strategy of pre-alignment. The test setup has been installed in a room equipped with a...
    Go to contribution page
  15. ]"> MsSupawan Srichan(Synchrotron Light Research Institute)
    The two insertion devices, a 6.5 T superconducting wavelength shifter and a 2.4 T multipole wiggler, have been successfully installed at Siam Photon Source, a synchrotron light source operated by Synchrotron Light Research Institute, in Thailand. The insertion device installation has been done during machine shutdown period in August 2013. In order to install quickly and efficiently, the...
    Go to contribution page
  16. ]"> DrFrancesco Scantamburlo(IFMIF/EVEDA Project Team)
    IFMIF, presently in its Engineering Validation and Engineering Design Activities (EVEDA) phase, aims at running a 9 MeV / 125 mA / CW deuteron accelerator in Rokkasho (Japan) to validate IFMIF’s 40 MeV / 125 mA / CW accelerator with components mainly designed and constructed in European labs. Beam dynamics calculations demand accuracies and precisions of alignment for certain components within...
    Go to contribution page
  17. ]"> Jaromir Penicka(Argonne National Laboratory)
    The Advanced Photon Source (APS) at Argonne National Laboratory is a 7GeV third generation light source providing X-ray beams for research to scientific community since 1995. In order to remain the leading synchrotron radiation source in the western hemisphere, and to provide users with higher photon fluxes at higher photon energies, the APS decided to develop and build series of...
    Go to contribution page
  18. ]"> MrChristopher Curtis(Jefferson Lab)
    Jefferson lab has just completed an upgrade to its CEBAF accelerator which allows for an increase in the energy of delivered beam from 6 GeV to 12 GeV. The enhancements to the accelerator have included the addition of 10 new high performance cryomodules, and the removal, upgrade and refurbishment of almost 300 existing transport magnets. Outside of the main accelerator, a new experimental hall...
    Go to contribution page
  19. ]"> MrTaer Abu-Haniyi(SESAME)
    The synchrotron Light Source for Experimental Science and Applications in the Middle East (SESAME) is now in its final stage. This paper presents the methodology and initial results for mechanical alignment of the booster synchrotron for SESAME. SESAME booster is the old BESY 1 Booster and requires special considerations for alignment. This paper also presents the alignment strategy for the...
    Go to contribution page
  20. ]"> Prof.Xiaoye He(NSRL,USTC)
    The update engineering of Hefei Light Source is almost completed and the machine is being commissioned. This paper introduces the survey and alignment jobs that run throughout all the process of the engineering construction. They include establishing the control points of network for survey and alignment just after the building projects, surveying the first-level and second-level of control...
    Go to contribution page
  21. ]"> Mrtao luo(IHEP Dongguan campus)
    The paper has introduced the special datum in the alignment of particle accelerator, studying and improving the functional model of 3-D adjustment in the large-scale control network, to complete it in Visual C++ language. At last, it’s feasible and meaningful through verifying and analyzing the 3-D adjustment with total-station’s and laser tracker's observations in some accelerator's control network.
    Go to contribution page
  22. ]"> MrLan Dong(Institute of High Energy Physics)
    The article will introduct the surface network survey,tunnel network survey,elements fiducialization,adjustment calculation,and so on about CSNS.
    Go to contribution page
  23. ]"> DrHELENE MAINAUD DURAND(CERN)
    CLIC (Compact LInear Collider) Drive Beam Decelerator will generate RF power to accelerate the colliding beams. One key component of the decelerator is the Drive Beam Quadrupole (DBQ). More than 40000 DBQ will have to pre-aligned within a challenging precision and accuracy: the magnetic axis of each DBQ will have to be positioned in a cylinder with a radius of 20 micrometers, over a sliding...
    Go to contribution page
  24. ]"> MrWilliam Hoffman(Diamond Light Source Ltd)
    The longest beamline(I13) at Diamond was completed in July 2010. At 250m from the Storage Ring establishing a survey control network proved challenging. A TDA5005 was used to measure the 3D network. Currently a second long beamline (I14) is being constructed. It is envisaged that we use the AT401 to measure and establish the network for I14. This paper will look at a simulation of the...
    Go to contribution page
  25. ]"> MrRodrigo Junqueira Leão(Centro Nacional de Pesquisa em Energia e Materiais - CNPEM / Laboratório Nacional de Luz Síncrotron - LNLS)
    The new Brazilian Light Source, Sirius, will be commissioned in 2018 and is considered by many as a fourth generation Synchrotron facility project. The Survey and Alignment activities are currently in the planning phase and one of the focus is the target holders development. Those target holders will be installed in our accelerator to serve as a network of reference points to be used in the...
    Go to contribution page
  26. ]"> DrHELENE MAINAUD DURAND(CERN)
    The CLIC study requires 10 micrometers precision and accuracy over 200m for the pre-alignment of beam related components. A solution based on laser beam as straigth line reference is being studied at CERN. It involves camera/shutter assemblies as micrometric positioning sensors. It includes reference targets on the shutter in order to compute the coordinates of the laser spot centre from...
    Go to contribution page
  27. ]"> MrGuillaume Kautzmann(CERN)
    In the frame of the HIE-ISOLDE project, most of the existing ISOLDE REX line will be replaced by a superconducting Linac in order to upgrade the energy and intensity of the REX ISOLDE facility at CERN. This upgrade involves the design, construction, installation and commissioning of 2 low-β and 4 high-β cryomodules. Each high-β -cryomodule houses five high-β superconducting cavities (6 for the...
    Go to contribution page
  28. ]"> MrsNa MA(Division of Accelerator Technology, Dongguan Campus,Institute of High Energy Physics(IHEP), Chinese Academy of Sciences(CAS).)
    Because space distance of ground control network in spallation neutron source is large and requirements of absolute precision are strict, the traditional measurement is difficult to meet the requirements of measurement. In view of this, GPS is adopted to solve the problem, which is not limited to intervisibility and of high accuracy. Through alignment experiment in "standard detection field”,...
    Go to contribution page
  29. ]"> MrGeorg Gassner(SLAC National Accelerator Laboratory)
    In some cases traditional autocollimation techniques cannot be used for surface alignment, either due to the surface not being reflective enough, or being curved, or the line-of-sight normal to the surface not being accessible. This paper provides examples on how we are using a laser and a CCD camera to map the location and orientation of various surfaces.
    Go to contribution page
  30. ]"> MsGao Ting(Changcheng Institute of Metrology & Measurement)
    With laser Tracker widely used in industrial measurement field,More attention is concentrated on how to calibrate a laser tracker in standard environment laboratory. In this paper, a new device which could be applied to calibrate a laser tracker is introduced. The device employs a laser interferometer as the standard and gives the reference lengths in horizontal and vertical direction by two...
    Go to contribution page
  31. ]"> MrDominique Missiaen(CERN)
    The Long Shut-Down 1 (LS1), has been triggered by the repair of the splices in the interconnections of the Large Hadron Collider (LHC) cryo-magnets. The “weakness” of these splices needed to be repaired in order to run the LHC at its ultimate energy of 14TEV to accumulate more luminosity and events to improve the knowledge of the parameters of the Higgs’s boson discovered at CERN in 2012. This...
    Go to contribution page
  32. ]"> MsMarta Llonch(ALBA - CELLS)
    The ALBA synchrotron light facility is a 3GeV storage ring able to work in top up mode which delivers X-Ray beams to seven beamlines, already in operation. One of the seven operating ALBA beamlines is CIRCE (BL24). A soft X-ray beam line that counts with two different end stations, Photoemission Electron Microscopy (PEEM) and Near Ambient Pressure Photoelectron spectroscopy (NAPP). Due to the...
    Go to contribution page
  33. ]"> MrHorst Friedsam(Fermi National Laboartory)
    Fermilab is transitioning from the collider era to a dedicated international neutrino and muon facility in accordance with the recent US P5 recommendations. While the long baseline neutrino facility (LBNF) is currently in the conceptual design phase, the muon program is ramping up rapidly. This presentation focuses on the g-2 project to be constructed over the next two years. Physicists plan...
    Go to contribution page
  34. ]"> Drhelene mainaud durand(CERN)
    CLIC (Compact LInear Collider) is a proposed 3 Tev e+/e- linear collider being studied at CERN. One of the main challenges in this study is to preserve the beam emittance growth of both the main linac and the beam delivery system in the vertical plane to below 10 nm. Such tolerances can only be achieved with beam based alignment which requires the pre-alignment of the components to 10 um over...
    Go to contribution page
  35. ]"> C. Zhang(Japan Synchrotron Radiation Research Institute)
    SPring-8 storage ring have critical alignment tolerances, especially for the magnets on common girders. We have been using the laser CCD-camera device for its alignment work. In renew this alignment device, we proposed an iris diaphragm laser alignment system, and illustrated at last workshop of IWAA2012. Recently, the development of this system was completed and performances of it were...
    Go to contribution page
  36. ]"> MrPatrick Bestmann(CERN)
    The Super Proton Synchrotron is the last machine in the LHC injector chain, just before the injection into the LHC. Operational since 1976 the SPS provides the LHC with a 450GeV beam and is not less demanding in terms of alignment than the LHC. At high energy the alignment is playing an even more critical role for the beam orbit due to the fact that the SPS corrector magnets are designed for...
    Go to contribution page
  37. ]"> DrTsuyoshi Suwada(Accelerator Laboratory, KEK, High Energy Accelerator Research Organization)
    The initial realignment of the long beam line is in progress at the KEKB injector linac due to the big earthquake struck in Japan in March 2011 and also towards the Super KEK B-factory project. The injector linac is a 600-m-long linear accelerator that will directly inject electron and positron beams into the Super KEKB rings under construction. The injector linac comprises eight sectors (A–C...
    Go to contribution page
  38. ]"> MrHao Guo(Shanghai Institute of Applied Physics,Chinese Academy of Sciences)
    Annually realignment was initiated in August this year. With the combination of Laser Tracker and digital level, all the monuments and fiducials on the magnets in the Storage Ring had been measured. By the Spatial Analyzer(SA) software, the collecting data adjustment had been accomplished. The deviations between the actual positions and the theoretical ones of Quadrupoles were obtained. And...
    Go to contribution page
  39. ]"> DrHELENE MAINAUD DURAND(CERN)
    The position of the low beta quadrupoles of the LHC is monitored by Hydrostatic Levelling Systems (HLS) and Wire Positioning Systems (WPS). These magnets are located on each side of the four experimental areas, where the level of residual radiation will increase with the next steps of LHC operation. This will reduce the possibility of future access in these areas more and more. The regular...
    Go to contribution page
  40. ]"> MsLei WU(Institute of High Energy Physics, Chinese Academy of Sciences)
    HEPS(High Energy Photon Source) is a proposed 5GeV third generation light source with 50pm emittance at IHEP.The alignment tolerance for a string of quadrupoles and sextupoles on a 5.4 meters girder is 30 micrometers. To achieve the high precision requirements, the vibrating wire alignment technique will be used to align several magnets installed on the long girder. The method is based on...
    Go to contribution page
  41. ]"> MsJing Liang(Division of Accelerator Technology, Dongguan Campus,Institute of High Energy Physics(IHEP), Chinese Academy of Sciences(CAS).)
    A laser tracker accuracy test experiment is introduced in this paper.uing laser interferometer, we tested the laser tracker accuracy in the horizontal,longitudinal and vertical direction. And then statistics of laser tracker Precision in BEPCII storage ring from 2007-2010 is shown. According the statistics, actual distance precision and angle precision are given to calculate mean square error...
    Go to contribution page
  42. ]"> MrJiaxin Chen(Institute of High Energy Physics (IHEP))
    China Spallation Neutron Source(CSNS) use the diamond like carbon foils(DLC) in the stripping foil system. The foil's thickness is between 100μg/cm2 and 200μg/cm2. With the characteristics of brittle, thin and opaque of the CSNS foils, it is very difficult to measure the thickness. The thickness of the foil has an important effect on the stripping efficient and beam losses. This paper focuses...
    Go to contribution page
  43. ]"> MrWilliam Jansma(Argonne National Laboratory)
    GRETINA is a ¼ scale diminutive version of the proposed Gamma-Ray Energy Tracking Array (GRETA). This new type of gamma-ray detector is designed to study the structure and properties of atomic nuclei. It uses large crystals of hyper-pure germanium and is the first detector to use the concept of gamma-ray energy tracking.1 In August 2013 the GRETINA detector was delivered to the Argonne Tandem...
    Go to contribution page
  44. ]"> MsMarta Llonch(ALBA - CELLS)
    The 3GeV ALBA synchrotron light facility has currently seven operational state-of-the-art phase-I beamlines, comprising soft and hard X-rays. Additionally, two phase-II beamlines are in construction. Since as early as 2012, ALBA Synchrotron has been hosting official users; however, the machine independent slab is being surveyed since 2009 (once the whole installation was finished). The ALBA...
    Go to contribution page
  45. ]"> MrGeorg Gassner(SLAC National Accelerator Laboratory)
    This poster gives an overview of the alignment engineering projects at SLAC
    Go to contribution page
  46. ]"> DrChenghao Yu(Brookhaven National Laboratory)
    Smoothing is a technique to achieve accurate relative alignment of components and it’s a main concern of accelerator alignment. Several smoothing techniques are reviewed in this article and the principle and application of smoothing based on best-fit transformation are introduced as there is no other paper discussing this before. Compared with other methods, smoothing based on best-fit...
    Go to contribution page
  47. ]"> MrBrian Norsk Jensen(MAX IV Laboratory)
    The MAX IV project inauguration takes place June 21st 2016. The Linear accelerator is being commissioned. The First beamline at MAX IV, the FemtoMAX beamline is ready. It will use the electrons from the Linac to produce X-rays in the Femtosecond region. The status of the installation work at the rest of the facility is described and the time schedule for installations of beamlines in 2015 is...
    Go to contribution page
  48. ]"> MrDominique Missiaen(CERN)
    As well as, the Long Shut-Down 1 (LS1), many other projects are still progressing at CERN. The LINAC4, which will be the essential part of the injector chain in the future, is in the installation phase and will be connected to the existing accelerators in 2018. AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma which can then be harnessed to...
    Go to contribution page
  49. ]"> DrNorio Tani(J-PARC Center, JAEA)
    J-PARC 3GeV RCS suffered from the misalignments of several millimeters of the magnets in both horizontal and vertical directions caused by the Earthquake on March 11, 2011. As the beam loss was acceptable for beam operation at 300kW, the beam operation was implemented without alignment until May, 2013. Realignment of 3GeV RCS was carried out from July to November, 2013 in conjunction with the...
    Go to contribution page
  50. ]"> DrMika Masuzawa(KEK)
    SuperKEKB is a next-generation B-factory machine, which aims to achieve a peak luminosity 40 times higher than that of KEKB. It will be built utilizing the existing KEKB tunnel. The SuperKEKB construction started in 2010, and the beam commissioning is scheduled to take place in 2015. Newly fabricated magnets are now being installed in the tunnel, and initial alignment work has begun. ...
    Go to contribution page
  51. , ]"> MrGuozhu Cai(IMP.CAS), MrWenjun Chen(IMP.CAS)
    This article mainly described a method of measured the Heavy Ion Medical Machine in WuWei .We have installed and aligned most magnets of Heavy Ion Medical Machine by laser tracker and its fitting software SA. we set up a global Fram to determine the theoretical position of origin of each subsystem for whole Medical Machine . A local Frame which based on theoretical origin was set up for each...
    Go to contribution page
  52. ]"> MrFan Yang(School of Navigation & Aerospace Engineering, Information Engineering University)
    Position and posture measurements of large facility are necessary works in many fields, but the old one-dimensional measuring technology is no longer to meet the growing requirement of measuring accuracy, range and speed, so new measuring technology and method should be study. Point accuracy of micrometer can be realized by single station of Laser Tracker in small range, but it is necessary to...
    Go to contribution page
  53. ]"> MrZhiyong KE(Dongguan Neutron Science Center)
    In CSNS, the DTL(Drift Tube Linac) is part of the Linac accelerator which accelerates H- ion from 3 MeV to 80 MeV, and it is proposed a high alignment tolerance requirement which is both 0.05mm in the transverse and vertical direction and 0.10mm in the longitudinal direction, the challenge work is proceeded optically and mechanically by an established method with a laser tracker system, and...
    Go to contribution page
  54. ]"> Mrjiandong yuan(IMPCAS)
    As the key elements of accelerator driven sub critical system (Accelerator driven sub-critical systems-ADS), Cry Module is the emphasis and difficulty of superconducting linac alignment because of its Invisibility and ultra-low temperature characteristics. Collaborative align and monitoring cold mass used by laser tracker and micro alignment telescope ware proposed. Optical cross and its...
    Go to contribution page
  55. ]"> MrGUOZHU CAI(engineer)
    Abstract content The laser trackers of API T3 and Leica AT401 are usually used in the survey network of accelerator. This paper presents the comparison from their technology detail, metrology test in the institute,and surveying in the control network. API T3 owns outstanding performance in distance, and AT401 owns stable performance in angle and fast warm.Moreover,both of them are...
    Go to contribution page
  56. ]"> Prof.Xiaoye He(Natiobal Synchrotron Radiation Laboratory, University of Sciense and Technology of China)
    To ensure the high accuracy requirement of alignment and installation of HLSⅡ, the high accuracy control network is necessary. The primary control network provides high accuracy reference to local control network. After optimization design that using Monte-Carlo method, according to the structure characteristic of HLSⅡ, the primary control network is measured by several different instruments,...
    Go to contribution page
  57. ]"> DrChenghao Yu(Brookhaven National Laboratory)
    NSLS-II requires ±100 micron alignment precision to adjacent girders which is mainly depending on the precision of survey control network. The design is determined to establish a laser tracker and digital level based control network, but it was changed to be measured by AT401 only later. Simulation shows that an estimated accuracy of ~50 micron can be achieved. The analysis of actual...
    Go to contribution page
  58. ]"> Mrtong wang(Accelerator Center, IHEP)
    China is building a world-class spallation neutron source,called CSNS.It's located in Guangdong province, which is in the south of China,and the civil construction is under progress.This paper introduced the surveying scheme of the primary network of CSNS,including the control points distribution and the instruments using,then the LGO software was used for the processing of the GPS...
    Go to contribution page
  59. ]"> MrXiaolong Wang(ihep)
    HEPS is a new generation sychrotron light source in design in China.Its energy will be 5GeV and emittance will be 0.5~0.1nmrad.The alignment tolerance for the magnets in each girder is 30 micron. To achieve the goal we will apply the vibrating wire alignment system to align the magnets in each girder.
    Go to contribution page
  60. ]"> MsHongyan Zhu(IHEP)
    This paper introduces the design and simulation of a WPM (Wire Position Monitor) used in the cryogenic system of an Accelerator Driven System (ADS). The WPM is designed to monitor the contraction of cold masses during the cooling-down operation. In this paper, POISSON-2D electrostatic field software is used to calculate the best characteristic impedance for the WPM. Furthermore, the time...
    Go to contribution page
Baidu
map