Establishing Control Survey Network for Long Beamlines at Diamond Light Source

Not scheduled
Main Building (IHEP)

Main Building

IHEP

19B Yuquan Road, Shijingshan District,Beijing, 100049

Speaker

MrWilliam Hoffman(Diamond Light Source Ltd)

Description

The longest beamline(I13) at Diamond was completed in July 2010. At 250m from the Storage Ring establishing a survey control network proved challenging. A TDA5005 was used to measure the 3D network. Currently a second long beamline (I14) is being constructed. It is envisaged that we use the AT401 to measure and establish the network for I14. This paper will look at a simulation of the I13 network and the proposed adjacent I14 network to consider the feasibility of using the AT401

Primary author

MrWilliam Hoffman(Diamond Light Source Ltd)