1. IEbrowser is NOTsupported anymore. Please use Chrome, Firefox or Edgeinstead.
2. If you are a new user, please registerto get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jspAny questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file sizeallowed for upload is 100 Mb.
13–17 Oct 2014
IHEP
PRC timezone

SUPERKEKB MAIN RING TUNNEL MOTION

Not scheduled
Main Building (IHEP)

Main Building

IHEP

19B Yuquan Road, Shijingshan District,Beijing, 100049

Speaker

DrMika Masuzawa(KEK)

Description

SuperKEKB is a next-generation B-factory machine, which aims to achieve a peak luminosity 40 times higher than that of KEKB. It will be built utilizing the existing KEKB tunnel. The SuperKEKB construction started in 2010, and the beam commissioning is scheduled to take place in 2015. Newly fabricated magnets are now being installed in the tunnel, and initial alignment work has begun. Effects of the construction of new utility buildings around the tunnel perimeter are observed by a level survey, and monitored continuously by the BINP HLS system in the tunnel. The SuperKEKB tunnel motion due to such heavy construction is summarized, along with the effects of the uncontrolled tunnel temperatures on magnet alignment.

Primary author

DrMika Masuzawa(KEK)

Co-authors

Presentation materials

Baidu
map