-
10:30
Implementing quality Management at the FLASH Accelerator-Arne Brinkmann(Deutsches Elektronen Synchrotron)
-
10:30
Progress of Longitudinal Tomography in RCS of CSNS-LI Mingtao(高能所)
-
10:30
Beam Position Measurement and Control at the CSNS Target-Yue Yuan(IHEP)
-
10:30
Correction of sextupole-yanru Wei(IHEP)
-
10:30
Maintenance of the flow meter to prevent un-noticed false reading.-Daiki Takahashi(Accelerator Engineering Corporation)
-
10:30
Measurement and correction of coupling with skew quads in BEPCII/BER-JI HONGFEI(高能所)
-
10:30
Working point optimization towards high intensity beam commissioning at CSNS-RCS-Shouyan XU(高能所)YUAN YUE(高能所)
-
10:30
Multi-function use of BPM on CSNS linear accelerator-YUAN YUE(高能所)
-
10:30
Reliability analysis of superconducting section for CAFe-HAOYE WANG(近代物理研究所)
-
10:30
The Improvement of CSNS Linac RF System Operation Stability-MU Zhencheng(高能所)
-
10:30
Single points of failure at the Canadian Light Source-Nataliya Zalatar(C)Stephen Carruthers(Canadian light Source Saskatoon SK Canada)
-
10:30
Reliability of the Coupled Cyclotron Facility at NSCL-Andreas Stolz(Michigan State University)
-
10:30
Electrical design, installation and commissioning-Viktor Fred(European Spallation Source ERIC)
-
10:30
Accelerator Performance in FAIR Phase 0-Petra Schuett(GSI Helmholtz Centre for Heavy Ion Research)
-
10:30
Gradient Maintenance at Jefferson Lab-Kenneth Baggett(Jefferson Lab)
-
10:30
Top-off operation realization for Hefei Light Source II-Wei Xu(USTC)
-
10:30
ESS Machine Protection System Lattice Simulator for Use Cases-Stephane Gabourin(ESS)
-
10:30
First experiences during ESS commissioning-Marc Munoz(European Spallation Source)
-
10:30
CERN LHC Cryogenics: availability calculation tool improvement and new helium balance monitoring tool development-Gerard FERLIN(CERN)
-
10:30
The new vibration condition monitoring system at the ISIS Synchrotron-Brower Julian(STFC/ISIS)Yaqoob Asim(STFC/ISIS)
-
10:30
Automatic Fault Notification and Analysis for RHIC Operations-Gregory Marr(Brookhaven National Laboratory)
-
10:30
Measurement and matching of beam parameters extracted from CSNS/RCS-Yue Yuan(IHEP)
-
10:30
Reliability maintenance of microwave sources for BEPCII Linac-Hua SHI(高能所)
-
10:30
Reporting Incidents using JIRA Software at Synchrotron SOLEIL-Jean-Francois Lamarre(S)Thomas MARION(SYNCHROTRON SOLEIL)
-
10:30
Machine parameters management of CSNS accelerator-Yue Yuan(IHEP)
-
10:30
Energy Dispersion Measurement and Optimization of CSNS Linear Accelerator-Yue Yuan(IHEP)
-
10:30
Inspections for a superconducting rotating-gantry-hiroshi uchiyama(Accelerator Engineering Corporation)
-
10:30
Reliability test of small power supplies in SuperKEKB Main Ring-Shu Nakamura(KEK)
-
10:30
Failure analysis and fault tracking at the synchrotron light source PETRA III-Dennis Haupt(DESY)
-
10:30
Software development to support LIPAc beam operation and RFQ conditioning-Antti Jokinen(Fusion For Energy BA-IFMIF, Germany)
-
10:30
Maintenance and enhancement of the electrical and cooling systems for the operation of Linear IFMIF Prototype Accelerator (LIPAc)-Keitaro Kondo(QST)
-
10:30
Framework for flexible Programmable Logic Controller (PLC) design in protection systems-Martin Carroll(ESS)
-
10:30
LIPAc Control System from Reliability Point of View: Design Concept and Integration-Yosuke Hirata(National Institutes for Quantum and Radiological Science and Technology)
-
10:30
Operation statistics of Gunma University Heavy Ion Medical Center-Hikaru Souda(Yamagata University, Gunma University)
-
10:30
Development of web tools for fault tracking of the Linear IFMIF Prototype Accelerator (LIPAc)-Jose Franco Campos(Q)
-
10:30
The operation status of CSNS front end-Shengijn Liu(IHEP)
-
10:30
Action plan to reduced water leaks on brazing joints at SOLEIL-Laurent NADOLSKI(Synchrotron SOLEIL)
-
10:30
Warning System in Operation of the PLS-ll-YUNHO KIM(PAL)
-
10:30
The operational reliability of CSNS 400Hz AC Series Resonant Pulse High Voltage Power Supply-Liu Meifei(CSNS)
-
10:30
Production of carbon ion at electron cyclotron resonance ion source for high energy carbon ion radiotherapy-Masayuki Muramatsu(National Institutes for Quantum and Radiological Science and Technology)
-
10:30
ALBA synchrotron tunnel HVAC system review-Joan Casas(ALBA Synchrotron)Jordi Iglesias(ALBA Synchrotron)Lluisa Fuentes(ALBA Synchrotron)
-
10:30
Reliability and Trust – The case of a Protontherapy facility including a Particle accelerator-Samuel Meyroneinc(Institut Curie)
-
10:30
AVAILABILITY ANALYSIS OF CEPC LINAC-Cai Meng(高能所)
-
10:30
High Power beam commissioning of CAFe-WEILONG CHEN(近代物理研究所)