10–15 Nov 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone

Session

Accelerator Systems

14 Nov 2019, 13:30
Guangzhou SYSU Kaifeng Hotel

Guangzhou SYSU Kaifeng Hotel

Conveners

Accelerator Systems

  • violeta toma(TRIUMF)

Presentation materials

There are no materials yet.

  1. ]"> Zheng Ting Ang(TRIUMF VANCOUVER CANADA)
    14/11/2019, 13:30
    Accelerator System
    oral
    The TRIUMF ISAC accelerator complex is in consists of ISAC-I room temperature structure and ISAC-II superconducting structure. ISAC-I linac has eighteen RF systems in operation for about twenty years, and ISAC-II linac has forty superconducting QWR. The SRF cavities has been in operation for some about ten years. Major developments in the RF systems for the system reliability will be reported...
    Go to contribution page
  2. ]"> Keitaro Kondo(QST)
    14/11/2019, 14:00
    Accelerator System
    oral
    The Linear IFMIF Prototype Accelerator (LIPAc) to accelerate a 9 MeV deuteron beam at 125 mA in CW is under commissioning in Rokkasho, Japan, in order to validate the low energy section of the 40 MeV IFMIF accelerator under the Broader Approach Agreement in the field of fusion energy research between Japan and EURATOM. The LIPAc RF system for RFQ consists of eight RF chains, whose maximum...
    Go to contribution page
  3. ]"> DrQilong Sun(SSRF)
    14/11/2019, 14:30
    Optimizing Availability
    oral
    SSRF is a 3rd generation 3.5 GeV light source. It became fully operational for users in 2009 and is presently celebrating its 10 years operation in 2019. From the former seven beamline, SSRF has fifteen beamlines and nineteen experiment stations in 2019. Ten Insert Devices (IDs) had been installed in the Shanghai Synchrotron Radiation Facility (SSRF) storage ring. The ID gaps were repeatedly...
    Go to contribution page
Building timetable...
Baidu
map