| [1] |
WANG Jun-Hua,ZHENG Kai,LI Wei-Min,YANG Yong-Liang,LIU Zu-Ping,ZHOU Ze-Yan,WANG Lin,SUN Bao-Gen,CHEN Yuan-Bo,HUANG Long-Jun,MA Li,CAO Jian-She,YUE Jun-Hui,LIU De-Kang,YE Kai-ong. Key Technologies in Transverse Feedback System of Bunch by Bunch at HLS. Chinese Physics C, 2008, 32(S1): 96-98. |
| [2] |
WANG Shu-Hong,PEI Guo-Xi,CHI Yun-Long,CHEN Yan-Wei,CAO Jian-She,KONG Xiang-Cheng,ZHAO Feng-Li,HOM Mi,CHEN Zhi-Bi,LIU Wei-Bin,DENG Bing-Lin,GENG Zhe-Qiao,PEI Shi-Lun,SHEN Li,LE Qi,YE Qiang. BEPCⅡ Linac Beam Commissioning and Operation. Chinese Physics C, 2008, 32(S1): 215-217. |
| [3] |
LI Gang,ZHAO Ji-Jiu,WANG Ke-Xiang,YUE Ke-Juan. Research of Cryogenic Control System at BEPCⅡ. Chinese Physics C, 2008, 32(S1): 83-85. |
| [4] |
ZHAO Xiao-Yan,CAO Jian-She,WANG Lin,YUE Jun-Hui,YE Qiang,SUI Yan-Feng,ZHAO Ying,MA Hui-Zhou,ZHAO Jing-Xia,ZHANG Guo-Qing,ZHAO Zheng,Zhang Lei. Beam Loss Monitoring System of BEPCⅡ and Its First Application. Chinese Physics C, 2008, 32(S1): 80-82. |
| [5] |
WANG Guang-Wei,SHA Peng,PAN Wei-Min,SUN Yi,LI Zhong-Quan,LIU Rong,HUANG Tong-Ming,ZENG Ri-Hua,ZHAO Guang-Yuan,HUANG Hong,XU Yu-Fen,MA Qiang,LIN Hai-Ying,XU Bo,WANG Qun-Yao. Construction of the BEPCⅡ RF System. Chinese Physics C, 2008, 32(S1): 169-171. |
| [6] |
WANG Chun-Hong,WANG Xiao-Li,LIU Jia,SHI Hao-Li,GAN Quan,LIU Shu,ZHAO Ji-Jiu. BEPCⅡ Magnet Power Supply Control System. Chinese Physics C, 2007, 31(1): 91-95. |
| [7] |
JIAO Yi,ZHOU De-Min,WANG Jiu-Qing,QIN Qing,XU Gang,FANG Shou-Xian. Application of Frequency Map Analysis to the BEPCⅡ Lattice. Chinese Physics C, 2007, 31(6): 586-592. |
| [8] |
LIU Bo,GU Meng-Ping,WANG Shu-Hong,CHI Yun-Long,YANG Xing-Wang,TIAN Shuang-Min,LIU Wei-Bin,YE Qiang. Experiment and Operation of BEPCⅡ Electron Gun System. Chinese Physics C, 2006, 30(5): 466-469. |
| [9] |
ZHAO Feng-Li,HOU Mi,ZHAO Yan-Ping,LIU Jin-Tong,ZHANG Jing-Ru,ZHOU Yao-Xiang,HAN Da-Wei. Microwave System for BEPCⅡ-Linac. Chinese Physics C, 2006, 30(2): 155-158. |
| [10] |
JIAO Yi,ZHANG Lei,WANG Jiu-Qing,YUE Jun-Hui,CAO Jian-She,WANG Jun-Hua,ZHENG Kai. Application of the Turn-by-Turn Beam Position Measurements on BEPC Storage Ring. Chinese Physics C, 2006, 30(10): 1018-1021. |
| [11] |
ZHAO Ji-Jiu,WANG Chun-Hong,LEI Ge,GAO Wen-Chun,WANG Xiao-Li,LI Gang,YUE Ke-Juan,ZHAO Zhuo,LIU Jia,XU Shi-Fu,HUANG Song,XUE Peng,KONG Deng-Ming,MA Mei,WANG Jin-Can,XU Guang-Lei. BEPCⅡ Control System. Chinese Physics C, 2006, 30(11): 1100-1106. |
| [12] |
KANG Wen,HAO Yao-Dou,HANG Qian,CHEN Jin-Hui. Design and Construction of a New Type Kicker Magnet for Injection of BEPCⅡ Storage Ring. Chinese Physics C, 2005, 29(6): 611-614. |
| [13] |
LIU Bo,GU Meng-Ping,CHi-Yun-Long,YANG Xing-Wang,TIAN Shuang-Min. Study on BEPC Experimental Electron Gun System. Chinese Physics C, 2005, 29(5): 507-511. |
| [14] |
HU Chun-Liang. Beam-Based Calibration System of BPM Offset on BEPC. Chinese Physics C, 2004, 28(2): 200-204. |
| [15] |
LUO Yun,HUANG Nan,WEN Xue-Mei. Coupling Measurements and Compensation for BEPC SR Mode. Chinese Physics C, 2003, 27(5): 445-448. |
| [16] |
MA Li,CAO JianShe,WANG Lin. Tune Measurements in the BEPC Storage Ring. Chinese Physics C, 2000, 24(8): 770-774. |
| [17] |
Ma Li,Shi Ping,Ye Kairong. Upgrade of BPM System for the BEPC Storage Ring. Chinese Physics C, 1998, 22(5): 475-480. |
| [18] |
Deng Jingkang,Shang Rencheng,Zhu Shengjiang,Xu Wang,Zhang Juping,Jin Qingzhen,Zhu Henian,Xia Shaojian,Yan Yonglian,Guo Yanan. Study on Polarization of BEPC Beam and a Polarimeter. Chinese Physics C, 1997, 21(6): 562-570. |
| [19] |
BES Collaboration. τ Mass Measurement at Beijing Electron Positron Collider (BEPC). Chinese Physics C, 1992, 16(10): 865-875. |
| [20] |
YU Hong. J/ψ Physics at BEPC and the Generalized Moment Analysis. Chinese Physics C, 1991, 15(3): 265-278. |