| [1] |
LUO Tao,JIN Da-Peng,XING Jun,HUANG Nan,DONG Ming-Yi,LI Wei-Guo,LI Hai-Bo,WU Ying-Zhi,ZHANG Qing-Jiang,LIU Guan-Chuan. Application of movable collimators to the BEPCⅡ. Chinese Physics C, 2010, 34(11): 1742-1748.doi:10.1088/1674-1137/34/11/015 |
| [2] |
XUE Zhen,SHAN Qing,XU Zi-Zong,WANG Xiao-Lian,WU Jian,WANG Yong-Gang,ZHANG Tao,HU Tao,CAI Xiao,WANG Yi-Fang. A fast luminosity monitor for BEPCⅡ. Chinese Physics C, 2010, 34(4): 487-491.doi:10.1088/1674-1137/34/4/013 |
| [3] |
SUI Yan-Feng,WANG Lin,ZHAO Ying,YUE Jun-Hui,LI Xiao-Ping,CAO Jian-She,MA Li. BEPCⅡ wire scanner system. Chinese Physics C, 2010, 34(10): 1661-1664.doi:10.1088/1674-1137/34/10/021 |
| [4] |
ZHANG Chuang. BEPCⅡ: construction and commissioning. Chinese Physics C, 2009, 33(S2): 60-64.doi:10.1088/1674-1137/33/S2/016 |
| [5] |
SUN Yi,WANG Guang-Wei,PAN Wei-Min,LI Zhong-Quan,HUANG Hong,MA Qiang,LIN Hai-Ying,XU Bo,WANG Qun-Yao,LI Shao-Peng,HE Kun,LIU Ya-Ping. First Superconducting RF System Commissioning for BEPCⅡ in China. Chinese Physics C, 2008, 32(S1): 191-193. |
| [6] |
SHI Cai-Tu,NI Gan-Lin,SUN Xian-Jing,CAO Zan,YIN Zhao-Sheng,PANG Jia-Biao,CHEN Wan,LI Li,CHEN Fu-San,PENG Quan-Ling,YIN Bao-Gui,ZHANG Zhuo,SUN Yao-Lin,WANG Jian-Li,ZHANG Jia-Fei. Design and Fabrication of the Magnets for BEPCⅡ Project. Chinese Physics C, 2008, 32(S1): 7-10. |
| [7] |
CHEN Ming,FENG Zi-Qiang,ZHAO Shen-Jie,ZHOU Zu-Sheng,YU Hai-Bo,HOU Hong-Tao,ZHANG Zhi-Gang,MA Guang-Ming,MAO Dong-Qing,MA Zhen-Yu,LIU Jian-Fei. RF Power Sources of the Storage Ring for SSRF. Chinese Physics C, 2008, 32(S1): 197-199. |
| [8] |
WANG Guang-Wei,SHA Peng,PAN Wei-Min,SUN Yi,LI Zhong-Quan,LIU Rong,HUANG Tong-Ming,ZENG Ri-Hua,ZHAO Guang-Yuan,HUANG Hong,XU Yu-Fen,MA Qiang,LIN Hai-Ying,XU Bo,WANG Qun-Yao. Construction of the BEPCⅡ RF System. Chinese Physics C, 2008, 32(S1): 169-171. |
| [9] |
ZHAO Ji-Jiu,WANG Chun-Hong,LEI Ge,GAO Wen-Chun,WANG Xiao-Li,LI Gang,YUE Ke-Juan,ZHAO Zhuo,LIU Jia,XU Shi-Fu,HUANG Song,XUE Peng,KONG Deng-Ming,MA Mei,WANG Jin-Can,XU Guang-Lei. BEPCⅡ Control System. Chinese Physics C, 2006, 30(11): 1100-1106. |
| [10] |
YU Cheng-Hao,KE Ming,DU Han-Wen,YIN Li-Xin,ZHAO Zhen-Tang,DONG Lan,HUANG Kai-Xi. Application Research of 3D Control Network Technology in BEPCⅡ Storage Ring. Chinese Physics C, 2006, 30(11): 1107-1112. |
| [11] |
ZHONG Juan,PAN Wei-Min. Study on the Performance of the Input Coupler for the BEPCⅡ Superconducting RF Cavity. Chinese Physics C, 2006, 30(10): 1014-1017. |
| [12] |
PEI Guo-Xi,SUN Yao-Lin,LIU Jin-Tong,CHI Yun-Long,LIU Yu-Cheng,LIU Nian-Zong. BEPCⅡ Positron Source. Chinese Physics C, 2006, 30(1): 66-70. |
| [13] |
LI Jia-Cai,ZHANG Liang-Sheng,HU Chun-Liang,WU Yuan-Ming,CUI Xiang-Zong,LIU Zheng-Quan,ZHANG Shao-Ping,ZHOU Bao-Qing,ZHENG Lin-Sheng. Design and Performance Measurement of the 1GeV/c Multiparticle Magnetic Spectrometer in the BEPC-LINAC Test Beam. Chinese Physics C, 2005, 29(1): 55-61. |
| [14] |
LIU Jin-Tong,GEN Zhe-Qiao,SUN Xian-Jing,SUN Yao-Lin,PEI Guo-Xi. Development of the BEPCⅡ Positron Source Flux Concentrator. Chinese Physics C, 2005, 29(4): 404-407. |
| [15] |
KANG Wen,HAO Yao-Dou,HANG Qian,CHEN Jin-Hui. Design and Construction of a New Type Kicker Magnet for Injection of BEPCⅡ Storage Ring. Chinese Physics C, 2005, 29(6): 611-614. |
| [16] |
YUAN Ren-Xian,YUE Jun-Hui,CAO Jian-She,MA Li. Simulation of BEPCⅡ′s BPM. Chinese Physics C, 2004, 28(6): 664-668. |
| [17] |
GOU Wei-Ping,PEI Guo-Xi. Design of BEPCⅡ Positron Source. Chinese Physics C, 2002, 26(3): 279-285. |
| [18] |
DAI Jian-Ping,CHAI Xue-Dong,ZHAO Zhen-Tang. Shunt Impedance and Power of the BEPC DC Separator. Chinese Physics C, 2001, 25(7): 680-683. |
| [19] |
Pei Guoxi,Xie Jialin,Zhou Shu,Sun Songlan. Optimization of the BEPC Positron Source. Chinese Physics C, 1990, 14(S2): 125-134. |
| [20] |
PEI Guo-Xi,XIE Jia-Lin,ZHOU Shu,SUN Song-Lan. OPTIMIZATION OF BEPC POSITRON SOURCE. Chinese Physics C, 1990, 14(2): 110-117. |