| [1] |
Da-Li Zhang,Hong Lu,Huan-Yu Wang,Xin-Qiao Li,Yan-Bing Xu,Zheng-Hua An,Hui Wang,Feng Shi,Ping Wang,Xiao-Yun Zhao,. Beam test of CSES silicon strip detector module. Chinese Physics C, 2017, 41(5): 056101.doi:10.1088/1674-1137/41/5/056101 |
| [2] |
Xiao-Zhuang Wang,Hong-Liang Dai,Zhi Wu,Yue-Kun Heng,Jie Zhang,Ping Cao,Xiao-Lu Ji,Cheng Li,Wei-Jia Sun,Si-Yu Wang,Yun Wang. BESIII ETOF upgrade readout electronics commissioning. Chinese Physics C, 2017, 41(1): 016103.doi:10.1088/1674-1137/41/1/016103 |
| [3] |
Pei-Xian Li,Meng-Yun Guan,Chang-Gen Yang,Peng Zhang,Jin-Chang Liu,Yong-Peng Zhang,Cong Guo,Yi Wang. Preliminary test results of LAr prototype detector. Chinese Physics C, 2016, 40(11): 116005.doi:10.1088/1674-1137/40/11/116005 |
| [4] |
Jian-Yong Zhang,Xiao Cai,Xiao-Hu Mo,Di-Zhou Guo,Jian-Li Wang,Bai-Qi Liu,M. N. Achasov,A. A. Krasnov,N. Yu. Muchnoi,E. E. Pyata,E. V. Mamoshkina,F. A. Harris. Upgrade of beam energy measurement system at BEPC-Ⅱ. Chinese Physics C, 2016, 40(7): 076001.doi:10.1088/1674-1137/40/7/076001 |
| [5] |
Yun Wang,Ping Cao,Shu-bin Liu,Qi An. Fast control latency uncertainty elimination for the BESIII ETOF upgrade. Chinese Physics C, 2016, 40(9): 096101.doi:10.1088/1674-1137/40/9/096101 |
| [6] |
CHEN Tian-Xiang,LI Cheng,SUN Yong-Jie,CHEN Hong-Fang,SHAO Ming,TANG Ze-Bo,YANG Rong-Xing,ZHOU Yi,ZHANG Yi-Fei. A cosmic ray test platform based on high time resolution MRPC technology. Chinese Physics C, 2015, 39(5): 056003.doi:10.1088/1674-1137/39/5/056003 |
| [7] |
WANG Si-Yu,CAO Ping,LIU Shu-Bin,AN Qi. Clock auto-synchronization method for BESIII ETOF upgrade. Chinese Physics C, 2015, 39(12): 126102.doi:10.1088/1674-1137/39/12/126102 |
| [8] |
ZHU Jun,ZHANG Huang,PENG Shi-Xiang,REN Hai-Tao,XIA Lian-Sheng,WANG Wen-Dou,YANG Zhi-Yong,SHEN Yi,SHI Jin-Shui,ZHANG Lin-Wen,DENG Jian-Jun. Beam transport design for a 1 MeV prototype dielectric wall accelerator. Chinese Physics C, 2014, 38(4): 047001.doi:10.1088/1674-1137/38/4/047001 |
| [9] |
XU Tong-Ye,DU Yan-Yan,WANG Xu,SHAO Ruo-Bin,ZHANG Deng-Feng,ZHU Cheng-Guang. Test of the LHAASO electron detector prototype using cosmic rays. Chinese Physics C, 2014, 38(11): 116004.doi:10.1088/1674-1137/38/11/116004 |
| [10] |
CAO Ping,SUN Wei-Jia,JI Xiao-Lu,FAN Huan-Huan,WANG Si-Yu,LIU Shu-Bin,AN Qi. Prototype of time digitizing system for BESⅢ endcap TOF upgrade. Chinese Physics C, 2014, 38(4): 046101.doi:10.1088/1674-1137/38/4/046101 |
| [11] |
ZHANG Hui,SHAO Ming,LI Cheng,CHEN Hong-Fang,HENG Yue-Kun,SUN Yong-Jie,TANG Ze-Bo,JI Chang-Sheng,CHEN Tian-Xiang,YANG Shuai. A GEANT4 simulation study of BESⅢ endcap TOF upgrade. Chinese Physics C, 2013, 37(9): 096002.doi:10.1088/1674-1137/37/9/096002 |
| [12] |
ZHENG Bao-Jun,LI Yu-Lan,DENG Zhi-Yong,LI Bo. Drift field improvement and test in a GEM-TPC prototype. Chinese Physics C, 2011, 35(1): 56-60.doi:10.1088/1674-1137/35/1/012 |
| [13] |
WANG Yi,WANG Jing-Bo,YAN Qiang,LI Yuan-Jing,CHENG Jian-Ping,YUE Qian,LI Jin. A prototype of a high rating MRPC. Chinese Physics C, 2009, 33(5): 374-377.doi:10.1088/1674-1137/33/5/011 |
| [14] |
HAN Ji-Feng,ZHANG Jia-Wen,CHEN Jin,ZHANG Qing-Min,LIU Qian,XIE Yu-Guang,QIAN Sen,MA Lie-Hua. Test of BESⅢ RPC in the avalanche mode. Chinese Physics C, 2008, 32(5): 373-376.doi:10.1088/1674-1137/32/5/009 |
| [15] |
QIN Zhong-Hua,YAN Zhi-Kang,CHEN Yuan-Bo,WU Ling-Hui,LIU Jian-Bei,CHEN Chang,XU Mei-Hang,WANG Lan,MA Xiao-Yan,JIN Yan,LIU Rong-Guang,TANG Xiao,,,,. Construction of a Full-Length Prototype of the BESⅢ Drift Chamber and On-Detector Test for the BESⅢ Drift Chamber Electronics. Chinese Physics C, 2007, 31(4): 371-376. |
| [16] |
AN Shao-Hui,WU Chong,LI Xin,CHEN Hong-Fang,HENG Yue-Kun,SUN Zhi-Jia,WANG Yi-Fang,LI Cheng. Beam Test of the Time Resolution of the BESⅢ Endcap TOF. Chinese Physics C, 2005, 29(8): 775-780. |
| [17] |
Chen Guoming,Chen Hesheng,Jin Bingnian,Tang Xiaowei,Tong Guoliang,Wu Yigen,Zhong Chongchang. e/π Separation Analysis from L3 Calorimeter Beam Test. Chinese Physics C, 1992, 16(S1): 1-10. |
| [18] |
WANG Man,LI Jin,CUI Xiang-Zong,XIA Xiao-Mi,LAI Yuan-Fen,YAO Xiao-Guang. PROTOTYPE OF END CAP SHOWER COUNTERAND ITS BEAM TEST. Chinese Physics C, 1987, 11(3): 321-326. |
| [19] |
MA Ji-Mao,MAO Ze-Pu,MAO Hui-Shun,BAI Jing-Zhi,HOU Xiao-Jiang,SONG Xiao-Fei,ZHOU Jie,WU Jian-Wu,RONG Gang,XIE Pei-Pei,YAN Jie. BEAM TESTS OF THE PROTOTYPE OF BES MAIN DRIFT CHAMBER. Chinese Physics C, 1987, 11(4): 441-450. |
| [20] |
Barrel Shower Counter Group,Shower Counter Readout System Group. TEST BEAM STUDIES OF BES BARREL SHOWER COUNTER PROTOTYPE. Chinese Physics C, 1987, 11(3): 327-336. |