| [1] |
Qing-Lei Zhang,Shun-Qiang Tian,Bo-Cheng Jiang,Jie-Ping Xu,Zhen-Tang Zhao. Beam dynamics of the superconducting wiggler on the SSRF storage ring. Chinese Physics C, 2016, 40(3): 037001.doi:10.1088/1674-1137/40/3/037001 |
| [2] |
Jian-Yong Zhang,Xiao Cai,Xiao-Hu Mo,Di-Zhou Guo,Jian-Li Wang,Bai-Qi Liu,M. N. Achasov,A. A. Krasnov,N. Yu. Muchnoi,E. E. Pyata,E. V. Mamoshkina,F. A. Harris. Upgrade of beam energy measurement system at BEPC-Ⅱ. Chinese Physics C, 2016, 40(7): 076001.doi:10.1088/1674-1137/40/7/076001 |
| [3] |
LI Ji,PEI Yuan-Ji,SHANG Lei,FENG Guang-Yao,HU Tong-Ning,CHEN Qu-Shan,LI Cheng-Long. Beam dynamics simulations of the injector for a compact THz source. Chinese Physics C, 2014, 38(8): 088103.doi:10.1088/1674-1137/38/8/088103 |
| [4] |
FAN Hao,WU Cong-Feng,HE Duo-Hui. Calculations for shortening the bunch length in storage rings using a harmonic cavity. Chinese Physics C, 2014, 38(8): 087004.doi:10.1088/1674-1137/38/8/087004 |
| [5] |
JIAO Yi,XIAO Ou-Zheng. Beam dynamics studies of the photo-injector in low-charge operation mode for the ERL test facility at IHEP. Chinese Physics C, 2014, 38(6): 067003.doi:10.1088/1674-1137/38/6/067003 |
| [6] |
PEI Shi-Lun,LI Xiao-Ping,XIAO Ou-Zheng. Error and jitter e ect studies on the SLED for the BEPCⅡ-linac. Chinese Physics C, 2012, 36(5): 456-463.doi:10.1088/1674-1137/36/5/014 |
| [7] |
PEI Shi-Lun,CHI Yun-Long,WANG Shu-Hong,PEI Guo-Xi,ZHOU Zu-Sheng,HOU Mi,Mykola Ayzatskiy,Ivan Karnaukhov,Volodymyr Kushnir,Viktor Mytrochenko,Andrey Zelinsky. Beam dynamics studies on the 100 MeV/100 kWelectron linear accelerator for NSCKIPT neutron source. Chinese Physics C, 2012, 36(7): 653-660.doi:10.1088/1674-1137/36/7/015 |
| [8] |
CAI Xiao,FU Cheng-Dong,MO Xiao-Hu,QIN Qing,WANG Yi-Fang,ZHANG Jian-Yong. A scenario for high accuracy τ mass measurement at BEPC-Ⅱ. Chinese Physics C, 2012, 36(7): 573-577.doi:10.1088/1674-1137/36/7/001 |
| [9] |
MO Xiao-Hu,CHU Yuan-Ping,DONG Hai-Yi,FU Cheng-Dong,LI Xiao-Nan,LIU Qian,QU Hua-Min,QIN Qing,SHEN Cheng-Ping,WANG Yi-Fang,XU Jin-Qiang,ZHANG Jian-Yong,ZHANG Qing-Jiang,ZHANG Yin-Hong,ZHANG Tian-Bao,ZHAO Zhuo. Beam energy measurement system at BEPCⅡ. Chinese Physics C, 2010, 34(6): 912-917.doi:10.1088/1674-1137/34/6/050 |
| [10] |
LIU Yu-Dong,YUE Jun-Hui,WANG Na. Studies on electron cloud instability in BEPCⅡ. Chinese Physics C, 2009, 33(S2): 71-74.doi:10.1088/1674-1137/33/S2/018 |
| [11] |
ZHANG Wen-Zhi,TIAN Shun-Qiang,ZHANG Man-Zhou,HOU Jie,LI Hao-Hu,LIU Gui-Min,ZHAO Zhen-Tang. Design and first commissioning of a new mode with lower emittance in the SSRF storage ring. Chinese Physics C, 2009, 33(5): 397-400.doi:10.1088/1674-1137/33/5/016 |
| [12] |
TIAN Shun-Qiang,ZHANG Wen-Zhi,LI Hao-Hu,ZHANG Man-Zhou,HOU Jie,ZHOU Xue-Mei,LIU Gui-Min. Linear optics calibration and nonlinear optimization during the commissioning of the SSRF storage ring. Chinese Physics C, 2009, 33(S2): 83-85.doi:10.1088/1674-1137/33/S2/021 |
| [13] |
ZHOU Xue-Mei. Measurement of optics for the SSRF storage ring in commissioning. Chinese Physics C, 2009, 33(S2): 78-82.doi:10.1088/1674-1137/33/S2/020 |
| [14] |
GAO Jie. Bunch transverse emittance increase in electron storage rings. Chinese Physics C, 2009, 33(7): 572-576.doi:10.1088/1674-1137/33/7/013 |
| [15] |
GAO Jie. Analytical treatment of the nonlinear electron cloud effect and the combined effects with beam-beam and space charge nonlinear forces in storage rings. Chinese Physics C, 2009, 33(2): 135-144.doi:10.1088/1674-1137/33/2/012 |
| [16] |
ZHANG Chuang. BEPCⅡ: construction and commissioning. Chinese Physics C, 2009, 33(S2): 60-64.doi:10.1088/1674-1137/33/S2/016 |
| [17] |
WANG Shu-Hong,PEI Guo-Xi,CHI Yun-Long,CHEN Yan-Wei,CAO Jian-She,KONG Xiang-Cheng,ZHAO Feng-Li,HOM Mi,CHEN Zhi-Bi,LIU Wei-Bin,DENG Bing-Lin,GENG Zhe-Qiao,PEI Shi-Lun,SHEN Li,LE Qi,YE Qiang. BEPCⅡ Linac Beam Commissioning and Operation. Chinese Physics C, 2008, 32(S1): 215-217. |
| [18] |
WANG Shu-Hong,PEI Guo-Xi,LIU Wei-Bin,CHEN Yan-Wei,YE Qiang,GENG Zhe-Qiao. Studies on the Beam Orbit and Energy Instabilities at the BEPCⅡ Linac. Chinese Physics C, 2007, 31(11): 1067-1070. |
| [19] |
CHEN Fu-San,CHENG Jian. Logic of Quench Protection Assembly for BEPC-ⅡInteraction Region Superconducting Magnet. Chinese Physics C, 2006, 30(4): 349-353. |
| [20] |
WANG Shu-Hong,PEI Guo-Xi,SUN Yao-Lin,CHI Yun-Long,CHEN Yan-Wei,CAO Jian-She,KONG Xiang-Cheng,ZHAO Feng-Li,HOU Mi,DENG Bing-Lin. BEPCⅡ Linac Upgrade and Beam Commissioning. Chinese Physics C, 2006, 30(S1): 150-152. |