| [1] |
Xiao-Zhuang Wang,Hong-Liang Dai,Zhi Wu,Yue-Kun Heng,Jie Zhang,Ping Cao,Xiao-Lu Ji,Cheng Li,Wei-Jia Sun,Si-Yu Wang,Yun Wang. BESIII ETOF upgrade readout electronics commissioning. Chinese Physics C, 2017, 41(1): 016103.doi:10.1088/1674-1137/41/1/016103 |
| [2] |
K. Hara (for the ATLAS collaboration). ATLAS commissioning and early physics of resonance and jet production. Chinese Physics C, 2010, 34(9): 1530-1533.doi:10.1088/1674-1137/34/9/092 |
| [3] |
ZHANG Tian-Jue,GUAN Xia-Ling,CUI Bao-Qun. Design and construction progress of BRIF. Chinese Physics C, 2010, 34(1): 103-111.doi:10.1088/1674-1137/34/1/019 |
| [4] |
YANG Xiao-Dong,MAO Li-Jun,LI Guo-Hong,LI Jie,MA Xiao-Ming,YAN Tai-Lai,YUAN You-Jin,SONG Ming-Tao,YANG Jian-Cheng,LIU Yong,ZHAO Tie-Cheng,XIA Jia-Wen,ZHANG Wei,GAO Da-Qing,ZHOU Zhong-Zu,YAN Hong-Bin,MAO Rui-Shi,HE Yuan,HAN Shao-Fei,ZHENG Jian-Hua,YANG Xiao-Tian,ZHAO Hong-Wei,XIAO Guo-Qing,YIN Da-Yu,LI Peng,JIA Huan,Parkhomchuk Vasily,Reva Vladimir,Skorobogatov Dmitry. Commissioning of electron cooling in CSRe. Chinese Physics C, 2010, 34(7): 998-1004.doi:10.1088/1674-1137/34/7/013 |
| [5] |
ZHANG Wen-Zhi,TIAN Shun-Qiang,ZHANG Man-Zhou,HOU Jie,LI Hao-Hu,LIU Gui-Min,ZHAO Zhen-Tang. Design and first commissioning of a new mode with lower emittance in the SSRF storage ring. Chinese Physics C, 2009, 33(5): 397-400.doi:10.1088/1674-1137/33/5/016 |
| [6] |
TIAN Shun-Qiang,ZHANG Wen-Zhi,LI Hao-Hu,ZHANG Man-Zhou,HOU Jie,ZHOU Xue-Mei,LIU Gui-Min. Linear optics calibration and nonlinear optimization during the commissioning of the SSRF storage ring. Chinese Physics C, 2009, 33(S2): 83-85.doi:10.1088/1674-1137/33/S2/021 |
| [7] |
XIA Jia-Wen,YUAN You-Jin,LIU Yong,YANG Jian-Cheng,XU Hu-Shan,XIAO Guo-Qing,YANG Xiao-Dong,ZHANG Wei,GAO Da-Qing,ZHOU Zhong-Zu,MAO Rui-Shi,MAO Li-Jun,HE Yuan,XU Zhe,YANG Ya-Qing,XIAO Chen,YIN Da-Yu,ZHAO Tie-Cheng,WU Jun-Xia,LI Guo-Hong,LI Jie,LI Peng,LI Ke,HU Zheng-Guo. HIRFL-CSR commissioning in 2006 and 2007. Chinese Physics C, 2009, 33(S2): 12-17.doi:10.1088/1674-1137/33/S2/004 |
| [8] |
ZHOU Xue-Mei. Measurement of optics for the SSRF storage ring in commissioning. Chinese Physics C, 2009, 33(S2): 78-82.doi:10.1088/1674-1137/33/S2/020 |
| [9] |
YANG Xiao-Dong,LI Jie,MAO Li-Jun,LI Guo-Hong,ZHAN Wen-Long,XIA Jia-Wen,ZHAO Hong-Wei,XIAO Guo-Qing,YUAN You-Jin,SONG Ming-Tao,LIU Yong,YANG Jian-Cheng,GAO Da-Qing,ZHOU Zhong-Zu,HE Yuan,ZHANG Wei,ZHANG Jian-Hua,MAO Rui-Shi,ZHAO Tie-Cheng,Parkhomchuk Vasily. Commissioning of electron cooling in CSRm. Chinese Physics C, 2009, 33(S2): 18-21.doi:10.1088/1674-1137/33/S2/005 |
| [10] |
QIN Qing,HUANG Nan,LIU Wei-Bin,LIU Yu-Dong,PENG Yue-Mei,QIU Jing,WANG Dou,WANG Xin-Hao,WANG Na,WANG Jiu-Qing,WEI Yuan-Yuan,WEN Xue-Mei,XING Jun,XU Gang,YU Cheng-Hui,ZHANG Chuang,ZHANG Yuan,ZHAO Zheng,ZHOU De-Min. Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage. Chinese Physics C, 2009, 33(S2): 65-70.doi:10.1088/1674-1137/33/S2/017 |
| [11] |
ZHU Yong-Sheng. Bayesian credible interval construction for Poisson statistics. Chinese Physics C, 2008, 32(5): 363-369.doi:10.1088/1674-1137/32/5/007 |
| [12] |
CAO Jian-She,MA Li,MA Hui-Zhou,GUO Zhi-Jun,LEI Ge. Application of Libera BPM at BEPCⅡ for the Early Commissioning. Chinese Physics C, 2008, 32(S1): 102-104. |
| [13] |
WANG Shu-Hong,PEI Guo-Xi,CHI Yun-Long,CHEN Yan-Wei,CAO Jian-She,KONG Xiang-Cheng,ZHAO Feng-Li,HOM Mi,CHEN Zhi-Bi,LIU Wei-Bin,DENG Bing-Lin,GENG Zhe-Qiao,PEI Shi-Lun,SHEN Li,LE Qi,YE Qiang. BEPCⅡ Linac Beam Commissioning and Operation. Chinese Physics C, 2008, 32(S1): 215-217. |
| [14] |
WANG Guang-Wei,SHA Peng,PAN Wei-Min,SUN Yi,LI Zhong-Quan,LIU Rong,HUANG Tong-Ming,ZENG Ri-Hua,ZHAO Guang-Yuan,HUANG Hong,XU Yu-Fen,MA Qiang,LIN Hai-Ying,XU Bo,WANG Qun-Yao. Construction of the BEPCⅡ RF System. Chinese Physics C, 2008, 32(S1): 169-171. |
| [15] |
HOU Mi,GENG Zhe-Qiao. Construction of the Phasing System for BEPCⅡ Linac. Chinese Physics C, 2007, 31(4): 391-394. |
| [16] |
WANG Shu-Hong,PEI Guo-Xi,SUN Yao-Lin,CHI Yun-Long,CHEN Yan-Wei,CAO Jian-She,KONG Xiang-Cheng,ZHAO Feng-Li,HOU Mi,DENG Bing-Lin. BEPCⅡ Linac Upgrade and Beam Commissioning. Chinese Physics C, 2006, 30(S1): 150-152. |
| [17] |
KANG Wen,HAO Yao-Dou,HANG Qian,CHEN Jin-Hui. Design and Construction of a New Type Kicker Magnet for Injection of BEPCⅡ Storage Ring. Chinese Physics C, 2005, 29(6): 611-614. |
| [18] |
Zeng Jinyan,Lei Yian,Wu Wenqing. Construction of Paired States in Axially Symmetric Nuclei. Chinese Physics C, 1995, 19(S4): 405-411. |
| [19] |
Ma Jimao,Mao Huishun,Bai Jingzhi,Xie Peipei,Yan Jie,Wang Yaohui,Mao Zepu,Liu Rongguang,Shen Benwei,Song Xiaofei,Zhou Jie,Wu Zhendong,Fan Qun,Jin Yan,Rong Gang. The Design and Construction of the BES Main Drift Chamber. Chinese Physics C, 1990, 14(S4): 325-337. |
| [20] |
Zhou Yuehua,Lu Changguo,Gu Weixin,Lu Weida,Que Youkun,Li Peiqin,Hao Wei,Zhou Li,Zhu Guosheng,Zheng Xiaoming,Chen Wenjun. Design and Construction of the Barrel Shower Counter in the Beijing Spectrometer. Chinese Physics C, 1990, 14(S2): 105-113. |