1. IEbrowser is NOTsupported anymore. Please use Chrome, Firefox or Edgeinstead.
2. If you are a new user, please registerto get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jspAny questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file sizeallowed for upload is 100 Mb.
28 October 2026 to 1 November 2026
湖北省武汉市 (Wuhan, Hubei)
Asia/Shanghai timezone

MTD barrel timing layer overview

31 Oct 2026, 15:15
15m
神农架厅

神农架厅

Speaker

jin wang(school of physics Peking Uniersity)

Description

The High Luminosity LHC (HL-LHC) phase will provide unprecedented opportunities for precision measurements and searches for rare processes, while posing significant challenges due to the high radiation environment and up to 200 simultaneous interactions per bunch crossing. To mitigate the impact of pile-up, the CMS experiment will install the MIP Timing Detector (MTD), providing charged-particle timing with a precision of 30–60 ps. Its central part, the Barrel Timing Layer (BTL), consists of about 166,000 LYSO:Ce crystal bars with double-ended SiPM readout. Following the completion of large-scale production and with detector assembly now largely completed, the BTL project is moving toward final qualification, system integration, and commissioning preparation. This contribution will give an overview of the BTL design and performance, and present the latest status of detector assembly and large-scale system tests.

Co-author

Xiaohu SUN(Peking University)

Presentation materials

Baidu
map