-
09:00
CEPC IARC report and responses
-
09:20
CEPC geology study and civil engineering design status-Jianfeng Liu(HDEC)
-
09:40
Studies of the tolerance to machine errors at all energies, with evaluation of the final emittance and energy spread for injection in the collider-Bin Wang(IHEP)
-
10:00
Simulation of injection at commissioning and orbit correction-Daheng JI(高能所)
-
10:40
CEPC instabilities at four energies including impedance budget (including all collimators) and electron cloud effects, and their limitation to luminosities-娜 王(IHEP)UNKNOWN 刘瑜冬
-
11:00
CEPC SRF cavity development status-鹏 沙(高能所)
-
11:20
CEPC instrumentation and feedback status-Yanfeng Sui(高能所)
-
11:40
CEPC magnets power source status-斌 陈(高能所)