09:00
CEPC geology investigation and civil engineering design-Jianfeng Liu
-
09:20
Control methods for the tunnel temperature-UNKNOWN 黄金书
-
09:40
Installation procedures of the Booster magnets beam pipe-Xiaolong Wang(高能所)
-
10:00
Studies of the tolerance to machine errors at all energies, with evaluation of the final emittance and energy spread for injection in the collider-Yiwei WANG(IHEP)
-
10:50
CEPC cost discussion
-
11:20
CEPC survey and groud vibration measurement progress-海静 王(高能所)
-
11:40
CEPC SRF cavity development status-鹏 沙(高能所)