-
14:00
CEPC geological investigation and civil engineering design progress report-Jianfeng LIU(HDEC)
-
14:25
Tuning of the CEPC IP coupling-源源 魏(高能所)
-
14:50
Comparison of local and non-local chromaticity correction scheme and the possible optimisation for CEPC ARC region-Yiwei WANG(IHEP)
-
15:15
Global comparison of CEPC vacuum system design with antechamber of photon absoreters with TDR vacuum system design-Yongsheng MA(高能所)
-
16:10
Feasibility evaluation of booster design with combined sextupole dipole magnets vs back up scheme of independent sxtupoles-Dou WANG(IHEP)
-
16:35
CEPC polarization R&D planning in EDR phase and polarization perspectives-Zhe DUAN(高能所)
-
17:00
CEPC tunnel ventilation channel dimensions and shaft cross section determination-UNKNOWN 黄金书