09:00
CEPC geological survey and civil engineering design progress status-Jianfeng Liu
-
09:20
Dipole magnet solution study for antechamber and photon absorber scheme-梅 杨Yongsheng MA(高能所)Guangyi Tang(IHEP)
-
09:40
CEPC main tunnel and auxiliary tunnel cabling and cooling water connection schemes up to components (booster and collider magnets)-UNKNOWN 黄金书斌 陈(高能所)梅 杨文 康(Accelerator Centor, IHEP)
-
10:00
Machine protection, collimators optimiazation and dump systems-小昊 崔(Accelerator Center)
-
10:50
Injection and extraction system progress status (all components included, with position and dimensions)-Jinhui Chen(Institute of High Energy Physics)
-
11:10
CEPC control system design progress status, including control rooms locations and requirements-Dapeng JIN(Institute of High Energy Physics, CAS, China)
-
11:30
CEPC environment, health and safty issues for cepc proposal-Guangyi Tang(IHEP)忠剑 马(高能所)