LCWS 2010
→Asia/Shanghai
Description
The 2010 Linear Collider Workshop (LCWS10) and the International Linear Collider meeting (ILC2010) will be hosted by a consortium of Chinese Institutes: Institute of High Energy Physics, Tsinghua University, Beijing university, Institute of Theoretical Physics, University of Sciences and Technologies of China.
-
-
Opening Plenary
- 1
- 2
- 3
- 4
- 10:30
break
- 12:30
Lunch
-
GDE: Executive Committee (closed) ROOM 106
ROOM 106
-
RD (closed) ROOM 201
ROOM 201
- 15:40
break
-
GDE Plenary Main Hall
Main Hall
- 12
- 13
- 14
-
LCWS Plenary Main Hall
Main Hall
- 15
- 16
- 17
- 18
-
-
- 10:30
break
-
GDE: CFS: Joint with Main Linac Room 105
Room 105
- 26
CFS Tunnel Issues
- 27
Klystron Cluster Equipment
- 28
DRFS Equipment
- 29
General Installation Equipment
- 30
General Discussion
- 26
-
GDE: Sources Room 101
Room 101
-
LCWS: gamma gamma VIP room
VIP room
-
IDAG meeting (closed) Room 201
Room 201
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
-
GDE: Executive Committee (closed) Room 106
Room 106
-
IDAG meeting (closed) Room 201
Room 201
- 12:30
Lunch
-
GDE: Beam Delivery System Room 103
Room 103
- 55
Joint with GG/ A high luminosity Photon collider without damping rings Valery Telnov (BINP)
- 56
The design of the cavity laser Brent Stuart (LLNL)
- 57
Status of the optical resonant cavity development Tohru Takahashi
- 58
Joint with CFS on IR hall
- 55
-
GDE: CFS: Joint with Main Linac
-
IDAG meeting (closed)
-
LCWS: gamma gamma: Joint with BDS and MDI See BDS for agenda Room 103
Room 103
-
GDE: Cost Mgmt Room 106
Room 106
-
GDE: Sources Room 101
Room 101
- 82
Polarized positron sources (Compton, ERL, Linac,…)(1)
- 82
- 15:30
break
-
GDE: Accelerator Physics / Beam Dynamics: Joint with Main Linac (note room change) Room 202
Room 202
- 83
Join with ML (Room 202)
- 83
-
GDE: Beam Delivery System
- 84
Session devoted to double rep-rate at lower IP energy
- 85
Double rep rate impact on DR
- 86
Double rep rate impact on sources
- 87
Discussion
- 84
-
GDE: CFS: Joint with BDS (note room change)
- 88
Asian Sample Engineering Design
- 89
General CFS Discussion
- 88
-
GDE: Cost Mgmt
-
GDE: Damping Rings: DR Double Rep Rate Options (Joint with BDS)
-
GDE: Sources
- 97
General Discussion
- 97
-
IDAG meeting (closed)
-
LCWS: Calorimetry/Muon Bldg8 Rm5
Bldg8 Rm5
- 98
Status of Sensor and FE Electronics tests for FCAL
- 99
PDE at various wave lengths
- 100
RPCs and muon scintillators
- 101
Aging study for SiD Hcal and Muon System RPC
- 102
Calibration
- 98
-
LCWS: SUSY/NP
- 103
- 104
Probing two universal extra dimension model photons at the ILC
- 105
- 106
- 107
-
LCWS: Tracking/Vertex: Silicon tracking R&D Bldg8 Rm1
Bldg8 Rm1
- 112
- 113
- 114
- 115
- 116
-
LCWS: gamma gamma
-
-
GDE: Accelerator Physics / Beam Dynamics
- 117
Running 3TeV CLIC at lower energies Room 104
Room 104
- 118
Design of CLIC Spin Rotator
- 119
Drive beam and amplitude stabilization in CLIC
- 117
-
GDE: CFS Room 105
Room 105
- 125
BDS Tunnel Cross Sections Americas Region
- 126
Current Status of Central Region Technical Layout
- 127
Current Status of European Region Central layout
- 128
General Discussion
- 125
-
GDE: Damping Rings: R&D Status Room 102
Room 102
- 129
R&D status at LNF
- 130
R&D status at IHEP
- 131
R&D status at SLAC - e-cloud
- 132
R&D status at SLAC - Kickers Modulators
- 133
R&D Status at LBNL
- 129
-
GDE: Main Linac/SRF Room 202
Room 202
- 134
Summary of understanding of quench limit in 9-cell cavities using T-mapping and optical inspection
- 135
Latest 9-cell cavity testing results from FNAL
- 136
Recent cavity test results from KEK
- 137
New results on field emission suppression
- 138
Comparison EP procesing parameters at KEK and JLAB
- 139
IHEP high gradient efforts on 1.3GHz 9-cell cavity for ILC
- 140
Efforts on the R&D of SRF cavity at Peking University
- 141
Replica-method and local grinding repair
- 134
-
LCWS: Higgs/EWSB: session 2: Higgs couplings to gauge bosons Bldg8 Rm3
Bldg8 Rm3
- 146
Luminosity measurement at ILC with FCAL
- 147
- 148
- 149
- 146
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
- 150
Introductions
- 150
-
GDE: Sources Room 101
Room 101
- 155
Undulator based source
- 155
- 10:30
break
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
- 156
Discussions: Review of present status and plans
- 156
-
GDE: Beam Delivery System: (note room change) Bldg8 Rm2
Bldg8 Rm2
- 157
BDS and MDI joint, SB2009 session
- 158
- 159
- 160
- 161
SB2009 topics discussion, SB2009 members
- 157
-
GDE: CFS Room 105
Room 105
- 162
Electrical/Mechanical Americas Region
- 163
Electrical/Mechanical Asian Region
- 164
General Discussion
- 162
-
GDE: Damping Rings: CesrTA Room 102
Room 102
- 165
CesrTA Overview
- 166
CesrTA EC Simulations Status
- 167
CesrTA LET Status and Plans
- 165
-
GDE: Main Linac/SRF Room 202
Room 202
- 168
Review of plans for upcoming cavity processing and testing
- 169
Review on ACD topics (new shape, large-grain cavity,vertical EP etc)
- 170
Update on global cavity database and yield evaluation
- 171
Status report of DESY activities
- 172
Discussion
- 168
-
GDE: Sources Room 101
Room 101
- 173
Undulator based soure
- 173
-
LCWS: Calorimetry/Muon Bldg8 Rm5
Bldg8 Rm5
- 174
- 175
- 176
- 177
-
LCWS: Higgs/EWSB: session 3, joint with gamma-gamma: More on Higgs couplings Bldg8 Rm3
Bldg8 Rm3
- 178
- 179
- 180
- 181
Higgs pair production in gamma gamma collier
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
- 182
SB2009 Discussions
- 183
SB2009 Discussions
- 182
-
LCWS: Tracking/Vertex: VXD R&D Bldg8 Rm1
Bldg8 Rm1
- 184
- 185
- 186
- 187
-
LCWS: gamma gamma: Joint with Higgs/EWSB See Higgs/ESWB for agenda Bldg8 Rm3
Bldg8 Rm3
-
GDE: Executive Committee (closed) Room 106
Room 106
-
RD (closed) Meeting Hall
Meeting Hall
- 12:30
lunch
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
-
GDE: Beam Delivery System
- 188
Devoted to: ATF2 presentations
- 189
Shintake Monitor in ATF2: Present Status, Takashi Yamanaka, The University of Tokyo
- 190
Shintake Monitor in ATF2: Performance Evaluation, Youhei Yamaguchi, The University of Tokyo
- 191
ATF2 tuning updates and further plans -- Glen White
- 192
Other ATF2 contributions, details to follow
- 188
-
GDE: CFS Room 105
Room 105
- 193
Americas Region
- 194
Asian Region
- 195
General Discussion
- 193
-
GDE: CLIC/ILC General Issues Working Group Room 106
Room 106
-
GDE: Damping Rings: ECLOUD Working Group Room 102
Room 102
- 196
Introduction
- 197
E-Cloud Build-up
- 198
E-Cloud Build-up
- 199
E-Cloud R&D status at KEKB
- 196
-
GDE: EDMS Room 106
Room 106
-
GDE: Main Linac/SRF Room 202
Room 202
- 200
ILC Gradient R&D status and challenges
- 201
Gradient strategy proposal
- 202
Discussion
- 200
-
GDE: Sources Room 101
Room 101
- 203
Polarized positron sources (Compton, ERL, Linac,…)(1)
- 203
-
LCWS: Higgs/EWSB: session 4, joint with SUSY/NP Bldg8 Rm3
Bldg8 Rm3
- 204
- 205
- 206
- 207
- 15:30
break
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
- 219
Schedule is coming
- 220
Double rep rate at lower IP energy. Joint with HLRF and cryomodule/cryogenics experts.
- 219
-
GDE: Damping Rings: ECLOUD Working Group Room 102
Room 102
- 221
Kickers R&D at ATF
- 222
WG Summary
- 221
-
GDE: EDMS Room 106
Room 106
-
GDE: Main Linac/SRF Room 202
Room 202
- 223
Status of NML
- 224
Status of STF
- 225
R&D status in INFN Pisa
- 226
Discussion
- 227
Plug-compatibility document
- 223
-
GDE: Sources Room 101
Room 101
- 228
General Discussion
- 228
-
LCWS: Higgs/EWSB: session 5, joint with SUSY/NP Bldg8 Rm3
Bldg8 Rm3
- 229
- 230
- 231
- 232
-
GDE: CFS Room 105
Room 105
- 243
Finalization of Dubna Report
- 244
Status of JINR efforts
- 245
Americas Region
- 246
European Region
- 247
Asian Region
- 248
General Discussion
- 243
-
GDE: Beam Delivery System Room 103
Room 103
- 249
Schedule is coming
- 250
Double rep rate at lower IP energy. Joint with HLRF and cryomodule/cryogenics experts.
- 249
-
GDE: CLIC/ILC General Issues Working Group Room 106
Room 106
-
GDE: ILC Communications Room 106
Room 106
-
-
-
WWS (closed) Room 201
Room 201
-
GDE: Accelerator Physics / Beam Dynamics
- 251
Discussions: Review of present status and plans 2
- 251
-
GDE: Beam Delivery System: (note room change) Bldg8 Rm2
Bldg8 Rm2
- 252
BDS and MDI joint, Vibration and Stability session (& possibly IR hall with CFS)
- 253
- 254
- 255
- 252
-
GDE: CFS
- 256
Americas Region
- 257
European Region
- 258
Asian Region
- 259
CFS Resource Allocation and Planning Discussion
- 256
-
GDE: Damping Rings: TDPII Organization/Plans + Baseline Decision
- 260
Discussion (all)
- 260
-
GDE: Main Linac/SRF
- 261
S1-G Cryomodule assembly status
- 262
S1-G Cavity assembly status
- 263
S1-G RF preparation
- 261
-
GDE: Sources Room 101
Room 101
- 264
Polarized electron update in US
- 265
Polarized electron update in Japan
- 266
Low emittance e- source without damping ring
- 264
-
LCWS: Loop/top/QCD Bldg8 Rm3
Bldg8 Rm3
- 267
- 268
- 269
- 270
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
- 271
Vibration and Stability Studies
- 271
-
LCWS: Tracking/Vertex: Spare slot Bldg8 Rm1
Bldg8 Rm1
- 10:30
break
-
ATF,ATF2/ICB (closed)
-
GDE: Accelerator Physics / Beam Dynamics
-
GDE: Beam Delivery System
- 276
BDS and DR joint, ATF/ATF2 and ICB meeting
- 277
ATF/ATF2 international collaboration by March 2013 (by Junji Urakawa, 10 min. including 5 min. Q&A.)
- 278
ATF/ATF2 Report in JFY2009 (by Nobuhiro Terunuma, 20 min. including 5 min. Q&A.)
- 279
TB Report to ICB in JFY2009 (by Philip Burrows, 30 min. including 5 min. Q&A.)
- 280
ICB Closed Session (by Ewan Paterson, 60 min.)
- 276
-
GDE: CFS Room 105
Room 105
- 281
Americas Region
- 282
Asian Region
- 283
General Discussion
- 281
-
GDE: Damping Rings: ATF/ATF2/ICB (joint with BDS) Room 102
Room 102
-
GDE: Main Linac/SRF Room 202
Room 202
- 284
Proposal of experiment schedule of S1-G cryomodule
- 285
Cavity test plan
- 286
RF test plan
- 287
Cryomodule thermal test plan
- 284
-
GDE: Sources
- 288
Positron source for ILC using hybrid target
- 289
Hybrid target Test at KEK Linac
- 290
Positron source for CLIC using hybrid target
- 288
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
- 296
Status of Beamcal Readout Chip
- 297
- 298
- 299
- 300
- 296
-
LCWS: SUSY/NP Bldg8 Rm3
Bldg8 Rm3
- 301
Identification of new physics and general WIMP search at the ILC
- 302
- 303
Decaying dark matter in a left-right symmetric model
- 304
- 301
-
LCWS: Tracking/Vertex: joint session with SIM/REC Bldg8 Rm1
Bldg8 Rm1
- 305
- 306
- 307
- 308
- 309
-
GDE: Executive Committee (closed)
-
IDAG meeting (closed): Lunch Room 201
Room 201
- 12:30
Lunch
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
- 310
Working Group Summaries
- 310
-
GDE: Beam Delivery System: (note room change) Bldg8 Rm2
Bldg8 Rm2
- 311
BDS and MDI joint
- 312
- 313
- 314
- 315
- 316
- 311
-
GDE: CFS Room 105
Room 105
- 317
CGD TDP II Planning and CFS Final Plenary Talk Preparation
- 317
-
GDE: Damping Rings: Damping Ring Collaboration Room 102
Room 102
- 318
LER Workshop/DR Collaboration
- 318
-
GDE: EDMS Room 106
Room 106
-
GDE: Main Linac/SRF Room 202
Room 202
- 319
FNAL industrialization study status
- 320
India industrialization study status
- 321
KEK industrialization study status
- 322
Status of XFEL module assembly facility at Saclay
- 323
For IPAC Industrialization session
- 319
-
GDE: Sources Room 101
Room 101
- 324
Positron source for CLIC using hybrid target
- 325
Liquid Pb target update
- 326
discussion
- 324
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
- 331
Joint with GDE Beam Delivery System
- 331
-
LCWS: Test Beam VIP room
VIP room
- 332
Fermilab Test Beam Facility
- 333
ETSB SLAC Test Beam Project
- 334
Asian Test Beam Facilities
- 335
AIDA Framework
- 336
Report on LCTW09 at Orsay
- 332
- 15:30
break
-
GDE Plenary
- 337
Group Discussion of TDP2 plans
- 338
Preparation for CERN / Geneva CLIC / ILC Workshop
- 337
-
GDE: EDMS Room 106
Room 106
-
GDE: EC/AAP Meeting
-
-
-
LCWS Plenary Bldg 1
Bldg 1
- 351
- 352
- 353
- 354
- 355
- 356
- 10:30
break